TOP

Guardrail pile driver

Power:37Kw

Depth: 1.4-2.6m

Left and right stroke:40-70cm

Size: 4.7*2.3*3.1m

The scope of application:It is widely used in piling and drilling machinery for highway, railway, construction, hydropower, port and other construction projects.

Product introduction
The loading guardrail pile driver has a good overall layout, compact structure, reasonable center of gravity layout and good stability. The body and walking have better buffering effect, advanced product performance, high work efficiency, comfortable operation, international components for key components, and can adapt to harsh working environment. It is an ideal equipment for piling, drilling and pulling pile construction. In addition, the high-power engine, closed rear storage can extend the service life of the engine, the construction time is greatly lengthened, the power is large, and the working ability is strong. The key components such as engine, box, bridge and hydraulic system are all made of reliable components, which improves the reliability of the whole machine. Loaded guardrail pile driver equipment is a product developed according to the market demand and its own technology, and is developed to the customer's needs. It is carefully developed with a new design concept. The overall function and structure are modularized. The fully enclosed modular installation Structure, which is more conducive to rapid product installation and transition.
装载机
Safety alert: First, users should strengthen safety training for operators and improve the safety awareness of operators.
Second, the operator must be trained to use the machine.
Third, the operator must read the instruction manual carefully before using the machine.
Fourth, before the mechanical work, the wearing parts should be inspected and replaced in time to avoid accidents.
Fifth, when the rig is working, the bolting of the rig bolt must be firm to prevent the occurrence of tripping and injury.
Sixth, when the drilling machine performs the pile-pushing process, the clamper must clamp the guardrail pile to prevent the tripping, and the guardrail pile slides down from the pile cap to injure people.
Seventh, when the rig is working, it is strictly forbidden to stand in front of the rig. The operator should be at the operation platform of the rig. It is strictly forbidden for the operator to stay away from the console.
Eighth, the hydraulic system of the drilling rig shall not be operated under the state of leakage. When the hydraulic oil leaks, it shall be treated in time.
Ninth, when the rig is not in use, the power should be cut off in time.
Product features
1. The domestic famous diesel engine is used as the power.
2. The transmission mechanism uses a fully hydraulic mechanical transmission.
3. Piling drilling is highly efficient.
4. The loading chassis makes shifting more convenient.
5. The positioning accuracy of the shifting machine is high.
6. The whole body of the rig is welded with stainless steel for durability.
7. Significant savings in working hours and more time and labor.
8. It can be applied to all-weather construction, and it is convenient to tow the air compressor.
装载机
Use and maintenance of the running-in period of the load-type guardrail pile driver:
7. The 100-hour operation of the guardrail pile driver is the running-in period. It should be used carefully during the running-in period. The load should not be too large. The use of the running-in period has a great impact on the service life of the machine.
After working for 50 hours, check that the cleanliness index of the hydraulic oil is not lower than 18/15. Also check and clean the oil inlet and return oil filter. After cleaning or replacing it every 200 hours, you should pay attention to the inspection. Rubber or asbestos gaskets are damaged and should be replaced if damaged.
The oil level of the hydraulic oil should be checked every 50 hours to ensure the oil level. Clean the fritters. When the machine is working for 400 hours, the hydraulic tank should be thoroughly cleaned once, the oil drain plug is removed, the hydraulic oil in the tank is drained, the screw plug is reinstalled, and the filter in the air filter is taken out and cleaned. Back, fill the hydraulic oil with about half of the fuel tank, then clean the fuel filter and put it back in place, install the screw plug, and fill it with hydraulic oil. Air filters and their filter elements should be inspected frequently.
In addition to the maintenance of the body of the guardrail pile driver, special attention should be paid to the drill bit maintenance of the drill. If the continuous working time of the drill bit exceeds the limit, the high temperature of the drill bit will be caused, which will affect the service life of the whole machine. Therefore, it is necessary to pay attention to maintaining the drill bit.
Applications
Construction Pictures
Construction Video
Technical parameters
Loader model 20
Power 37Kw
Engine model YN25GB
Aperture 110-300mm
Depth 1.4-2.6m
Left and right stroke 40-70cm
Size 4.7*2.3*3.1m
Weight 5T
Drilling machine parameters
Power head weight 140Kg
Drilling diameter φ 90-φ300mm
Drilling depth 1-3m
Drilling speed 400-900 mm/min
Impactor impact frequency 900-1200 Bpm
Impactor working wind pressure 0.6-1.2 Mpa
Impactor air consumption 7-13 m³/min

ONLINE MESSAGE

If you are interested in our products or have any questions, please click online staff to consult or leave us a message.